Robe Gasera- Ginir Road Project – 11.8 KM

Repair of quarry and special equipment of any types

Excavator Hitachi ZAXIS 250LCN was transported to the nearest service station of ADAMAS Corp. Diagnosis revealed violations in the operation of the engine, increased exhaust emissions, reduced pressure in the hydraulic system and damaged the left track links.

Our experts made a replacement of the air and fuel filters, engine oil replacement, replacement of hydraulic oil, replace the oil seals of the master cylinder (TRIAS hydraulics). We also tested the system and reduce the toxicity of the diesel particulate filter DPF and the selective reduction catalyst SRC. As a precaution, replace the air conditioning filter, add freon and washed excavator.

As a result, excavator Hitachi ZAXIS 250LCN become more productive and efficient. Lower fuel consumption, reduced duty cycle, vibration decreased. Due to repair of systems of decrease in toxicity excavator again meet with Stage IIIB.

The excavator was brought back to the granite quarry.

Challenge
Solution

Excavator Hitachi ZAXIS 250LCN was transported to the nearest service station of ADAMAS Corp. Diagnosis revealed violations in the operation of the engine, increased exhaust emissions, reduced pressure in the hydraulic system and damaged the left track links.

Our experts made a replacement of the air and fuel filters, engine oil replacement, replacement of hydraulic oil, replace the oil seals of the master cylinder (TRIAS hydraulics). We also tested the system and reduce the toxicity of the diesel particulate filter DPF and the selective reduction catalyst SRC. As a precaution, replace the air conditioning filter, add freon and washed excavator.

Result

As a result, excavator Hitachi ZAXIS 250LCN become more productive and efficient. Lower fuel consumption, reduced duty cycle, vibration decreased. Due to repair of systems of decrease in toxicity excavator again meet with Stage IIIB.

The excavator was brought back to the granite quarry.

Project Particulars

Share:
Contractor::

Alemayehu Ketema General Contractor
Client::

ERA
Consultant: Eng.:

Project::

Robe Gasera Gravel Road Project
Date of Contract Signature:

November 02,2003
Commencement date:

November 07,2003
Completion date:

May 07,2005
Revised completion date:

August,19,2005